contact-lede
Bring us in at site selection. The earlier we look at land, power and water together, the sooner your first data hall goes live.
company-firsts
2002 | SMART Tunnel, the world's first dual-purpose flood and traffic tunnel
2013 | The world's first variable density tunnel boring machine
2016 | Malaysia's first Digital IBS facility opens in Sepang
2018 | The world's first autonomous tunnel boring machine
company-esg
SBTi | Validated net zero targets through the Gamuda Green Plan 2030
AA | MSCI ESG rating
2023 | In the FTSE4Good Bursa Malaysia Index since
company-au
2019 | Gamuda Australia established
2022 | Sydney Metro West Western Tunnelling Package
2023 | DT Infrastructure joins the group
2025 | Eight renewable projects, Marinus Link and Stations Package West
2026 | Hazelwood North, Mortlake, and the Elizabeth Drive and Mamre Road upgrade
clients
AIMS Group
Sime Darby Property
EcoWorld
Sydney Metro
Marinus Link
way-5
Co-located renewable supply
Generation and storage on or near the campus. Our first Australian concept, at Hazelwood North, is under study.
way-4
Power and connection
Substations, high voltage connection and transmission civil works.
way-3
Core and shell, or a defined package
Structure and fabric on a fast-track program.
way-2
Land and enabling partner
A serviced, powered platform, ready for your builder or ours.
way-1
Whole campus, one contract
Land and enabling through to commissioned data halls.
person-bio
Rob leads pre-contracts for Gamuda Australia. He joined in 2026 after leading new business on the east coast and in New Zealand for Webuild, and nine years at John Holland before that. [confirm]
person
Rob Vitale
Head of Pre Contracts, Gamuda Australia
people-lede
The earlier we look at land, power and water together, the sooner your first data hall goes live.
quote
Completed in eight months rather than the anticipated 13 months.
Chiew Kok Hin, Chief Executive, AIMS Group
case-3-out
High voltage infrastructure built to national grid standards in Australia, the same standard a campus substation needs.
case-3-did
DT Infrastructure, in a 50:50 joint venture with Samsung C&T, is building the converter station civil works at Heybridge and Hazelwood and the land cable civil works, under a five-year contract from 2026.
case-3-brief
Balance of works for a new HVDC interconnector across Bass Strait.
case-3-head
Marinus Link Stage 1
Marinus Link Pty Ltd, Tasmania and Victoria. A$994m
case-2-out
The handover between shell and fit-out, where most schedule risk on a data centre sits, stayed inside one organisation and one program.
case-2-did
Phase 1, construction, completion, testing and commissioning (RM815m). Phase 2, MEP fit-out, testing and commissioning (RM928.6m). One team across both, with Digital IBS production ramped up for data centre components.
case-2-brief
Bring hyperscale capacity to Elmina Business Park, let by competitive tender from a field of prequalified contractors.
case-2-head
Elmina Business Park
Sime Darby Property, Selangor. RM1.74bn across two contracts
case-1-out
Handed over in eight months against an expected 13, in January 2024. AIMS then awarded us Block 3.
case-1-did
Main contractor, with the structure made as precast in our Digital IBS factories while groundworks went on, and the design resolved in a shared digital model before production started.
case-1-brief
AIMS needed a multi-storey data centre built quickly and to a high finish, in a market where every month of delay is a month of lost capacity.
case-1-head
AIMS Cyberjaya Block 2
AIMS Group, Cyberjaya. Eight storeys, 8 MW of IT load
cases-lede
Each one proves one of the three things that set Gamuda apart.
record-where
Data centres delivered across Selangor and Negeri Sembilan. In Australia, teams in Sydney, Brisbane and beyond, already working in western Sydney, Melbourne's west and the Latrobe Valley, and Queensland.
record-corridors
Sydney Metro West in western Sydney, with the western tunnels complete and the A$2.7bn Stations Package West under way, and the Elizabeth Drive and Mamre Road upgrade nearby.
row-9
Gamuda Renewables with Manthos
450 MW solar and 1,800 MWh battery on 1,100 hectares, co-located data centre under study
Acquired June 2026. In development
row-8
MEH SubCo
EPC for 300 MW of solar and a 1,449 MWh battery
A$790m. Completion January 2029
row-7
Marinus Link Pty Ltd
Converter stations and land cable civil works, DT Infrastructure and Samsung C&T JV
A$994m. Five years from 2026
row-6
A data centre client
Foundation, civil, structural and architectural works
RM451m, about A$166m. Q4 2024 to Q1 2026
row-5
A hyperscale client
389 acres acquired and sold to the client, then earthworks, utilities and water
RM1.01bn enabling works. Groundbreaking 2025
row-4
A global technology company
Site infrastructure, core and shell, MEP fit-out
Four contracts awarded in 2026. 2026 to 2028
row-3
EcoWorld (Quantum Alpha)
Shell and core of two blocks, consumer substation, water reservoir
RM2.14bn, about A$790m. Q3 2025 to Q3 2027
row-2
Sime Darby Property
Construction, MEP fit-out, testing and commissioning
RM1.74bn, about A$640m, two contracts. May 2024 to September 2026
row-1
AIMS Group
Turnkey main contractor, Next-Generation Digital IBS
8 MW IT load, Block 2. Block 2 complete. Block 3 followed
record-lede
Every project on our data centre and energy record, read against the stages of a campus. Open a row for the client, scope and value.
stage-9
Lower carbon
Digital IBS factories that run on renewable energy, and renewables we build and own on the power side.
stage-8
Testing and commissioning
Integrated testing of every system before the operator moves in, backed by systems integration on metro and rail networks.
stage-7
MEP fit-out
Power distribution, cooling plant and building services, installed by the team that built the shell.
stage-6
Core and shell
Digital IBS components come off robotic production lines and arrive on site ready to assemble.
stage-5
Design
We turn the operator's standard design into a buildable, fully coordinated model, with cloud-based BIM, 4D and 5D planning, and design for manufacture.
stage-4
Water
Reservoirs and supply designed into the site from the start. Gamuda has built Malaysia's largest water supply scheme, dams and treatment plants.
stage-3
Power
Consumer substations on site, high voltage converter stations and transmission civil works, and solar and battery assets that can feed a campus directly.
stage-2
Approvals
Our Australian teams work through environmental, planning and community processes on state-significant projects in New South Wales, Victoria, Queensland and Tasmania.
stage-1
Land and enabling
We find and secure land, then prepare it with earthworks, roads, utility connections and water, so you receive a serviced, ready-to-build platform.
lifecycle-lede
Nine stages from paddock to live data hall. Bring us in for all of them, or for the ones you need.
why-fact-4
2023
DT Infrastructure joins the group
why-fact-3
2019
Gamuda Australia established
why-fact-2
7,000
People across Gamuda's markets
why-fact-1
1976
Founded, now in its fiftieth year
why-3-proof
Hyperscale campuses carried from structure to commissioned systems by one delivery team.
why-3
One team, every stage.
Land, enabling works, core and shell, MEP fit-out and commissioning under one contract. Fewer interfaces, fewer surprises.
why-2-proof
Gamuda reports 40% faster delivery and 40% less embodied carbon with Digital IBS.
why-2
Factory speed on site.
Structure made as precast in our Next-Generation Digital IBS factories, from cloud-based design and robotic production lines, then assembled on site.
why-1-proof
Consumer substations delivered on data centre campuses in Malaysia, and HVDC converter station works under way in Tasmania and Victoria.
why-1
Energised, not just approved.
Substations, converter stations and transmission civil works, plus solar and battery projects we develop and own. We build the connection as well as the campus.
why-chart-note
From about 3% to about 13% of grid-supplied electricity. AEMO also reports that more than 40% of the data centre projects it has tracked since 2025 have dropped out or slipped in their connection status.
why-lede
Australia's data centre demand is climbing fast. The hard part is getting a powered, serviced site ready on time, then building on it without slipping. Gamuda builds both halves: the data centres, and the grid, renewables and water that keep them running.
glance-fig-4
2019
Building in Australia since, now Gamuda's largest revenue market
glance-fig-3
6GW
Renewable energy portfolio across Asia Pacific
glance-fig-2
RM62.5bn
Order book, September 2026, about A$23bn
glance-fig-1
RM7bn
Four hyperscale data centres awarded in 2026, about A$2.6bn
glance-lede
Gamuda builds the data centre and the power and water it depends on, under one contract. It does this at hyperscale in Malaysia today, and it is building the grid side in Australia now.
hero-lede
Land, power, water, structure and fit-out from one accountable partner. For operators and developers planning a data centre campus in Australia.