Gamuda Digital IBS factory in Malaysia
Precast module being lifted into place
Marinus Link interconnector across Bass Strait
Goulburn River Solar Farm at sunset
Gamuda data centres · Australia

Data centres,built from theground up.

Land, power, water, structure and fit-out from one accountable partner. For operators and developers planning a data centre campus in Australia.

01 / 04Digital IBS factory, Malaysia
Scroll

01At a glance

One partner from paddock to live data hall.

Gamuda builds the data centre and the power and water it depends on, under one contract. It does this at hyperscale in Malaysia today, and it is building the grid side in Australia now.

RM7bn

Four hyperscale data centres awarded in 2026, about A$2.6bn

RM62.5bn

Order book, September 2026, about A$23bn

6GW

Renewable energy portfolio across Asia Pacific

2019

Building in Australia since, now Gamuda's largest revenue market

02Why Gamuda

Speed to power is speed to market.

Australia's data centre demand is climbing fast. The hard part is getting a powered, serviced site ready on time, then building on it without slipping. Gamuda builds both halves: the data centres, and the grid, renewables and water that keep them running.

Data centre electricity use in the NEM

AEMO 2026 forecast, terawatt hours a year

2025–2652035–3634TWh a year
From about 3% to about 13% of grid-supplied electricity. AEMO also reports that more than 40% of the data centre projects it has tracked since 2025 have dropped out or slipped in their connection status.

i.

Energised, not just approved.

Substations, converter stations and transmission civil works, plus solar and battery projects we develop and own. We build the connection as well as the campus.

Proof. Consumer substations delivered on data centre campuses in Malaysia, and HVDC converter station works under way in Tasmania and Victoria.

ii.

Factory speed on site.

Structure made as precast in our Next-Generation Digital IBS factories, from cloud-based design and robotic production lines, then assembled on site.

Proof. Gamuda reports 40% faster delivery and 40% less embodied carbon with Digital IBS. How it works →

iii.

One team, every stage.

Land, enabling works, core and shell, MEP fit-out and commissioning under one contract. Fewer interfaces, fewer surprises.

Proof. Hyperscale campuses carried from structure to commissioned systems by one delivery team.

Gamuda and DT Infrastructure team at the Goulburn River Solar Farm

1976

Founded, now in its fiftieth year

7,000

People across Gamuda's markets

2019

Gamuda Australia established

2023

DT Infrastructure joins the group

03What we do

Every stage of a campus, from one accountable team.

Nine stages from paddock to live data hall. Bring us in for all of them, or for the ones you need.

01

Land and enabling

We find and secure land, then prepare it with earthworks, roads, utility connections and water, so you receive a serviced, ready-to-build platform.

02

Approvals

Our Australian teams work through environmental, planning and community processes on state-significant projects in New South Wales, Victoria, Queensland and Tasmania.

03

Power

Consumer substations on site, high voltage converter stations and transmission civil works, and solar and battery assets that can feed a campus directly.

04

Water

Reservoirs and supply designed into the site from the start. Gamuda has built Malaysia's largest water supply scheme, dams and treatment plants.

05

Design

We turn the operator's standard design into a buildable, fully coordinated model, with cloud-based BIM, 4D and 5D planning, and design for manufacture.

06

Core and shell

Digital IBS components come off robotic production lines and arrive on site ready to assemble.

07

MEP fit-out

Power distribution, cooling plant and building services, installed by the team that built the shell.

08

Testing and commissioning

Integrated testing of every system before the operator moves in, backed by systems integration on metro and rail networks.

09

Lower carbon

Digital IBS factories that run on renewable energy, and renewables we build and own on the power side.

04Track record

Delivered at every stage, at hyperscale.

Every project on our data centre and energy record, read against the stages of a campus. Open a row for the client, scope and value.

Project
Land and enabling
Power
Water
Core and shell
MEP fit-out
Testing and commissioning
Renewables
Data centres, Malaysia

Client

AIMS Group

Scope

Turnkey main contractor, Next-Generation Digital IBS

Value and program

8 MW IT load, Block 2. Block 2 complete. Block 3 followed

See the project →

Client

Sime Darby Property

Scope

Construction, MEP fit-out, testing and commissioning

Value and program

RM1.74bn, about A$640m, two contracts. May 2024 to September 2026

See the project →

Client

EcoWorld (Quantum Alpha)

Scope

Shell and core of two blocks, consumer substation, water reservoir

Value and program

RM2.14bn, about A$790m. Q3 2025 to Q3 2027

See the project →

Client

A global technology company

Scope

Site infrastructure, core and shell, MEP fit-out

Value and program

Four contracts awarded in 2026. 2026 to 2028

See the project →

Client

A hyperscale client

Scope

389 acres acquired and sold to the client, then earthworks, utilities and water

Value and program

RM1.01bn enabling works. Groundbreaking 2025

See the project →

Client

A data centre client

Scope

Foundation, civil, structural and architectural works

Value and program

RM451m, about A$166m. Q4 2024 to Q1 2026

See the project →
Power and energy, Australia

Client

Marinus Link Pty Ltd

Scope

Converter stations and land cable civil works, DT Infrastructure and Samsung C&T JV

Value and program

A$994m. Five years from 2026

See the project →

Client

MEH SubCo

Scope

EPC for 300 MW of solar and a 1,449 MWh battery

Value and program

A$790m. Completion January 2029

See the project →

Client

Gamuda Renewables with Manthos

Scope

450 MW solar and 1,800 MWh battery on 1,100 hectares, co-located data centre under study

Value and program

Acquired June 2026. In development

See the project →
Gamuda delivered this stage
In development
Read from each project's published scope confirm

Also in the data centre corridors

Sydney Metro West in western Sydney, with the western tunnels complete and the A$2.7bn Stations Package West under way, and the Elizabeth Drive and Mamre Road upgrade nearby. Sydney Metro West →

Where we work

Data centres delivered across Selangor and Negeri Sembilan. In Australia, teams in Sydney, Brisbane and beyond, already working in western Sydney, Melbourne's west and the Latrobe Valley, and Queensland.

05Case studies

Three jobs, three reasons to call us.

Each one proves one of the three things that set Gamuda apart.

Gamuda Digital IBS factory, Malaysia

i. Factory speed on site

AIMS Cyberjaya Block 2

AIMS Group, Cyberjaya. Eight storeys, 8 MW of IT load

The brief

AIMS needed a multi-storey data centre built quickly and to a high finish, in a market where every month of delay is a month of lost capacity.

What we did

Main contractor, with the structure made as precast in our Digital IBS factories while groundworks went on, and the design resolved in a shared digital model before production started.

The outcome

Handed over in eight months against an expected 13, in January 2024. AIMS then awarded us Block 3.

See the project →
Gamuda Digital IBS production, Malaysia

ii. One team, every stage

Elmina Business Park

Sime Darby Property, Selangor. RM1.74bn across two contracts

The brief

Bring hyperscale capacity to Elmina Business Park, let by competitive tender from a field of prequalified contractors.

What we did

Phase 1, construction, completion, testing and commissioning (RM815m). Phase 2, MEP fit-out, testing and commissioning (RM928.6m). One team across both, with Digital IBS production ramped up for data centre components.

The outcome

The handover between shell and fit-out, where most schedule risk on a data centre sits, stayed inside one organisation and one program.

See the project →
Marinus Link interconnector between Tasmania and Victoria

iii. Energised, not just approved

Marinus Link Stage 1

Marinus Link Pty Ltd, Tasmania and Victoria. A$994m

The brief

Balance of works for a new HVDC interconnector across Bass Strait.

What we did

DT Infrastructure, in a 50:50 joint venture with Samsung C&T, is building the converter station civil works at Heybridge and Hazelwood and the land cable civil works, under a five-year contract from 2026.

The outcome

High voltage infrastructure built to national grid standards in Australia, the same standard a campus substation needs.

See the project →
Completed in eight months rather than the anticipated 13 months.
Chiew Kok Hin, Chief Executive, AIMS Group

06Working with us

Start with one conversation.

The earlier we look at land, power and water together, the sooner your first data hall goes live.

Rob Vitale

Head of Pre Contracts, Gamuda Australia

Rob leads pre-contracts for Gamuda Australia. He joined in 2026 after leading new business on the east coast and in New Zealand for Webuild, and nine years at John Holland before that. confirm

Talk to Rob about your campus

Ways to engage

i.

Whole campus, one contract

Land and enabling through to commissioned data halls.

ii.

Land and enabling partner

A serviced, powered platform, ready for your builder or ours.

iii.

Core and shell, or a defined package

Structure and fabric on a fast-track program.

iv.

Power and connection

Substations, high voltage connection and transmission civil works.

v.

Co-located renewable supply

Generation and storage on or near the campus. Our first Australian concept, at Hazelwood North, is under study.

07Clients and company

Trusted by the operators and agencies we build for.

AIMS Group
Sime Darby Property
EcoWorld
Sydney Metro
Marinus Link

Gamuda Australia

2019Gamuda Australia established
2022Sydney Metro West Western Tunnelling Package
2023DT Infrastructure joins the group
2025Eight renewable projects, Marinus Link and Stations Package West
2026Hazelwood North, Mortlake, and the Elizabeth Drive and Mamre Road upgrade

Build Right. For Life.

SBTiValidated net zero targets through the Gamuda Green Plan 2030
AAMSCI ESG rating
2023In the FTSE4Good Bursa Malaysia Index since

Fifty years of engineering firsts

2002SMART Tunnel, the world's first dual-purpose flood and traffic tunnel
2013The world's first variable density tunnel boring machine
2016Malaysia's first Digital IBS facility opens in Sepang
2018The world's first autonomous tunnel boring machine
Gamuda 50 years, 1976 to 2026
Start early

Planning a campus in Australia?

Bring us in at site selection. The earlier we look at land, power and water together, the sooner your first data hall goes live.

Gamuda Australia
gamuda.com.au/contact
Thanks, we've got it. Someone from Gamuda Australia will be in touch soon.
That didn't send. Please check the fields and try again.
Gamuda Digital IBS factory, Malaysia

Gamuda data centres · Australia

Data centres, built from the ground up.

Land, power, water, structure and fit-out from one accountable partner.

Capability statement · 2026

01 At a glance

One partner from paddock to live data hall.

The data centre, and the power and water it depends on, under one contract.

RM7bn

Four hyperscale data centres awarded in 2026, about A$2.6bn

RM62.5bn

Order book, September 2026, about A$23bn

6GW

Renewable energy portfolio across Asia Pacific

2019

Building in Australia since, now Gamuda's largest revenue market

02 Why Gamuda

Speed to power is speed to market.

Data centre electricity use in the NEM, TWh a year (AEMO 2026)

i.

Energised, not just approved.

Substations, converter stations and transmission works, plus renewables we own.

ii.

Factory speed on site.

Precast structure from our Digital IBS factories: 40% faster, 40% less embodied carbon.

iii.

One team, every stage.

Land to commissioning under one contract. Fewer interfaces, fewer surprises.

03 What we do

Every stage of a campus, from one accountable team.

01Land and enabling
02Approvals
03Power
04Water
05Design
06Core and shell
07MEP fit-out
08Testing and commissioning
09Lower carbon

04 Track record

Delivered at every stage, at hyperscale.

Project
Land and enabling
Power
Water
Core and shell
MEP fit-out
Testing and commissioning
Renewables
Data centres, Malaysia
AIMS Cyberjaya Blocks 2 and 3
Elmina Business Park
Eco Business Park V
Port Dickson, four data centres
Springhill campus
Cyberjaya fast track
Power and energy, Australia
Marinus Link Stage 1
Mortlake Energy Hub Stage 1
Hazelwood North

i. Factory speed on site

AIMS Cyberjaya Block 2

Eight storeys and 8 MW of IT load, with the structure made as precast in our Digital IBS factories.

Expected
13 mo
Delivered
8 mo

“Completed in eight months rather than the anticipated 13 months.”Chiew Kok Hin, Chief Executive, AIMS Group

Gamuda Digital IBS factory, Malaysia
Gamuda Digital IBS production, Malaysia

ii. One team, every stage

Elmina Business Park

Sime Darby Property's hyperscale campus, carried by one team from structure to commissioned systems.

RM815m

Phase 1. Construction, completion, testing and commissioning

RM928.6m

Phase 2. MEP fit-out, testing and commissioning
Marinus Link interconnector between Tasmania and Victoria

iii. Energised, not just approved

Marinus Link Stage 1

Converter station civil works at Heybridge and Hazelwood, and the land cable civil works, for a new HVDC interconnector across Bass Strait. DT Infrastructure with Samsung C&T.

A$994m

Balance of works contract

5 years

From 2026, built to national grid standards

06 Working with us

Five ways to bring us in.

i.

Whole campus, one contract

Land and enabling through to commissioned data halls.

ii.

Land and enabling partner

A serviced, powered platform, ready for your builder or ours.

iii.

Core and shell, or a package

Structure and fabric on a fast-track program.

iv.

Power and connection

Substations, high voltage connection and transmission works.

v.

Co-located renewables

Generation and storage on or near the campus. A concept under study.

Goulburn River Solar Farm at sunset

Start early

Planning a campus in Australia?

Bring us in at site selection. The earlier we look at land, power and water together, the sooner your first data hall goes live.

RV

Rob Vitale

Head of Pre Contracts, Gamuda Australia

Send an enquiry →