What the client needed
Gamuda Renewables entered the Victorian market in 2026 with Hazelwood North, a 450 MW solar farm with 1,800 MWh of battery storage on 1,100 hectares in the Latrobe Valley.
Scope and delivery
- Acquired the project with development partner Manthos
- 450 MW solar farm with 1,800 MWh battery energy storage
- 1,100 hectare site in the Latrobe Valley
- Exploring a co-located data centre powered directly by on-site solar and storage
Gamuda describes the data centre idea as a utility-neutral approach. A campus on the site could draw power directly from the solar farm and battery, easing pressure on shared transmission. This is a concept under study, not a committed project.
Why it matters for your campus
For operators stuck in connection queues, generation on the same site changes the conversation. Gamuda would be developer, builder and energy owner in one.